0

Mini HouseHole FRP SMC Underground Purification Tank Sewage Treatment Plant

Item: FRP SMC Purification Tank
Material: FRP
Capacity: 1m3/5m3
Application: Widely Used for further Sewage Treatment from the septic tank system.

Mini HouseHole  FRP SMC Underground Purification Tank Sewage Treatment Plant

Select the number of specifications

Please check the product information you want!

Product Detail

Mini HouseHole  FRP SMC Underground Purification Tank Sewage Treatment Plant

Purification is a comprehensive treatment system for domestic waste water and sewage such

 as kitchen, bathing, washing and flushing toilets to convert domestic sewage into 

clean water for reuse.A high-efficiency bio reactor that degrades sewage through two-step anaerobic, 

one-step aerobic and simultaneous denitrification technology together with Physical, biochemical, 

and chemical effects to change sewage water to healthy water.




Item

Item Data

Material

Tank main material SMC FRP, Pipe system : PE/ PVC

Appearance

Smooth surface without cracks, uniform color, no holes, no obvious scratches

Capacity

1CBM, 5CBM

Weight

1CBM ≥140KG,

5CBM≥450kg

Size:

1CBM: L1300*W880*H1230mm,

5 CBM: L2300*W1650*H1700mm

Thickness

1CBM : single layer thickness ≥5 mm,

5 CBM single layer thickness ≥7mm

Inspection hole

1 CBM: One inspection hole with inner diameter 230mm

5 CBM: Two inspection hole with inner diameter 230mm

 

Corrosion Resistance

Acid resistance (5% sulfuric acid, 72h), no surface change

Alkali resistance (5% sodium hydroxide, 72h), no change on the surface

 

High temperature resistance

 

80℃, 48h, no change on the surface

Leakage

Fill with water after the drop test, and observe no leakage after 24h

 

Freeze Resistance

put it at -40°C for 24h, then it at normal temperature for 24h.

After Repeated three times , the tank body is not broken, damaged, and there is no deformation affecting the use.

 

 

Static load

Fill Full water under normal environment wih 400kg weights evenly on the top, in 24h, no cracks, damages, no deformation . The urn body and the urn cover are complete in good sealing performance after assembly and firmly fixed.



Working Principle 




Model

 

Working Craft

 

Treating Capacity /Day

 

Qty of User

BCSFP-001

A/O Denitrification Process

1CBM

3-10

BCSFP-005

A/O Denitrification Process

5CBM

10-20

 


Installation & Project 


1) .The equipment foundation should be handed over and inspected before installation. The foundation strength should meet design required. And suggest remeasure the coordinate position and elevation of the foundation. Need clear all the oil, gravel, soil, and stagnant water on the surface of the equipment foundation .

 

2) .Mark the center line and the equipment position line on the top surface of the foundation, and check again

 that the horizontal error and flatness of the top surface of the foundation are ≤ 3mm. If the flatness deviation is large,

Try to spread 5~10cm fine sand for leveling.

 

3).Befeore lifting the equipment, Please be clear the equipment loading and unloading site, direction and equipment transportation orders. Choose the suitable crane according to the equipment weight as well the loading and unloading site conditions

 

4).When hoisting the equipment body, tie the lifting belt to the inlet and outlet pipes, Lift itabove the corresponding construction site and adjust the equipment position. Then place the equipment on the installation site slowly with preventing vibration and bumps. Make sure the position and direction of the tank correctly, and the spacing between them must be correct, too.

 

5).Pipeline installation& connection should be considered when the equipment are ready. Connect the sewage pipe according to the installation drawing. The joints must be tightened and the interfaces can be stablen by glue.

 

6).After installation, Must injuct the sewage into the equipment (if there is no sewage, other water sources or tap

water can be used instead) between 1/2 and 2/3 of the tankbody. To check whether the equipment and pipelines are leaking. Make sure that no leakage at the pipe joints during the water test, and the equipment

should not be dislocated or tilted due to the rising ground water.

 

7).Before backfilling the foundation pit, check whether the water filling in the equipment meets the requirements.

 Ensure that the equipment is not horizontally misplaced during backfilling and the bottom of the equipment

must be manually compacted with soil. After the equipment is installed, it needs to be backfilled in time.

After backfilling, water should be injected to 10cm below the pipe in/outlet port to prevent the equipment

from floating due to the high groundwater level


Company Profile 

Hefei Bright Corner Building Co.,TD, located at the capital of Anhui province ,Hefei City . As the professional Supplier,

Bright Corner specialized in producing and marketing on PP/PE/FRP Sewage Treating Construction material with many years.

 And developed Anhui as well as other several production site covering an area of 19400 square meters.

Supply outdoor Household Sewage Treating items as Grease Trap, Septic Tanks, and Integrated Sewage Treatment Plants 

designed for efficient wastewater management. Utilizing advanced FRP and PP/PE materials, these products offer high

 durability, corrosion resistance, and leak-proof performance. Widely applied in residential, commercial, and rural environments, 

they meet strict environmental standards while ensuring low maintenance and long service life.

With the conception of “Integrity Management, Win-Win cooperation', Bright  Corner  products have gradually 

accepted in the market both at domestic and aboard. Have exported to more than 20 countries with good reputation. 

We sincerely hope to get chance to cooperate with everyone who interesting in the  landscape material and Sewage 

Treating Items in the further




Other Sewage Treatment 


If More Question, Welcome to contact As Below :

No comment

Product Detail

Mini HouseHole  FRP SMC Underground Purification Tank Sewage Treatment Plant

Purification is a comprehensive treatment system for domestic waste water and sewage such

 as kitchen, bathing, washing and flushing toilets to convert domestic sewage into 

clean water for reuse.A high-efficiency bio reactor that degrades sewage through two-step anaerobic, 

one-step aerobic and simultaneous denitrification technology together with Physical, biochemical, 

and chemical effects to change sewage water to healthy water.




Item

Item Data

Material

Tank main material SMC FRP, Pipe system : PE/ PVC

Appearance

Smooth surface without cracks, uniform color, no holes, no obvious scratches

Capacity

1CBM, 5CBM

Weight

1CBM ≥140KG,

5CBM≥450kg

Size:

1CBM: L1300*W880*H1230mm,

5 CBM: L2300*W1650*H1700mm

Thickness

1CBM : single layer thickness ≥5 mm,

5 CBM single layer thickness ≥7mm

Inspection hole

1 CBM: One inspection hole with inner diameter 230mm

5 CBM: Two inspection hole with inner diameter 230mm

 

Corrosion Resistance

Acid resistance (5% sulfuric acid, 72h), no surface change

Alkali resistance (5% sodium hydroxide, 72h), no change on the surface

 

High temperature resistance

 

80℃, 48h, no change on the surface

Leakage

Fill with water after the drop test, and observe no leakage after 24h

 

Freeze Resistance

put it at -40°C for 24h, then it at normal temperature for 24h.

After Repeated three times , the tank body is not broken, damaged, and there is no deformation affecting the use.

 

 

Static load

Fill Full water under normal environment wih 400kg weights evenly on the top, in 24h, no cracks, damages, no deformation . The urn body and the urn cover are complete in good sealing performance after assembly and firmly fixed.



Working Principle 




Model

 

Working Craft

 

Treating Capacity /Day

 

Qty of User

BCSFP-001

A/O Denitrification Process

1CBM

3-10

BCSFP-005

A/O Denitrification Process

5CBM

10-20

 


Installation & Project 


1) .The equipment foundation should be handed over and inspected before installation. The foundation strength should meet design required. And suggest remeasure the coordinate position and elevation of the foundation. Need clear all the oil, gravel, soil, and stagnant water on the surface of the equipment foundation .

 

2) .Mark the center line and the equipment position line on the top surface of the foundation, and check again

 that the horizontal error and flatness of the top surface of the foundation are ≤ 3mm. If the flatness deviation is large,

Try to spread 5~10cm fine sand for leveling.

 

3).Befeore lifting the equipment, Please be clear the equipment loading and unloading site, direction and equipment transportation orders. Choose the suitable crane according to the equipment weight as well the loading and unloading site conditions

 

4).When hoisting the equipment body, tie the lifting belt to the inlet and outlet pipes, Lift itabove the corresponding construction site and adjust the equipment position. Then place the equipment on the installation site slowly with preventing vibration and bumps. Make sure the position and direction of the tank correctly, and the spacing between them must be correct, too.

 

5).Pipeline installation& connection should be considered when the equipment are ready. Connect the sewage pipe according to the installation drawing. The joints must be tightened and the interfaces can be stablen by glue.

 

6).After installation, Must injuct the sewage into the equipment (if there is no sewage, other water sources or tap

water can be used instead) between 1/2 and 2/3 of the tankbody. To check whether the equipment and pipelines are leaking. Make sure that no leakage at the pipe joints during the water test, and the equipment

should not be dislocated or tilted due to the rising ground water.

 

7).Before backfilling the foundation pit, check whether the water filling in the equipment meets the requirements.

 Ensure that the equipment is not horizontally misplaced during backfilling and the bottom of the equipment

must be manually compacted with soil. After the equipment is installed, it needs to be backfilled in time.

After backfilling, water should be injected to 10cm below the pipe in/outlet port to prevent the equipment

from floating due to the high groundwater level


Company Profile 

Hefei Bright Corner Building Co.,TD, located at the capital of Anhui province ,Hefei City . As the professional Supplier,

Bright Corner specialized in producing and marketing on PP/PE/FRP Sewage Treating Construction material with many years.

 And developed Anhui as well as other several production site covering an area of 19400 square meters.

Supply outdoor Household Sewage Treating items as Grease Trap, Septic Tanks, and Integrated Sewage Treatment Plants 

designed for efficient wastewater management. Utilizing advanced FRP and PP/PE materials, these products offer high

 durability, corrosion resistance, and leak-proof performance. Widely applied in residential, commercial, and rural environments, 

they meet strict environmental standards while ensuring low maintenance and long service life.

With the conception of “Integrity Management, Win-Win cooperation', Bright  Corner  products have gradually 

accepted in the market both at domestic and aboard. Have exported to more than 20 countries with good reputation. 

We sincerely hope to get chance to cooperate with everyone who interesting in the  landscape material and Sewage 

Treating Items in the further




Other Sewage Treatment 


If More Question, Welcome to contact As Below :

Mini HouseHole FRP SMC Underground Purification Tank Sewage Treatment Plant
Item: FRP SMC Purification Tank
Material: FRP
Capacity: 1m3/5m3
Application: Widely Used for further Sewage Treatment from the septic tank system.
Long press to look detail
Long by picture save/share
Add Successfully

Mini HouseHole FRP SMC Underground Purification Tank Sewage Treatment Plant

enquiry
Add Successfully

Copyright © Hefei Bright Corner Building Material Co.,LTD All Rights Reserved. 

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.