Mini HouseHole FRP SMC Underground Purification Tank Sewage Treatment Plant
Purification is a comprehensive treatment system for domestic waste water and sewage such
as kitchen, bathing, washing and flushing toilets to convert domestic sewage into
clean water for reuse.A high-efficiency bio reactor that degrades sewage through two-step anaerobic,
one-step aerobic and simultaneous denitrification technology together with Physical, biochemical,
and chemical effects to change sewage water to healthy water.

Item | Item Data |
Material | Tank main material SMC FRP, Pipe system : PE/ PVC |
Appearance | Smooth surface without cracks, uniform color, no holes, no obvious scratches |
Capacity | 1CBM, 5CBM |
Weight | 1CBM ≥140KG, 5CBM≥450kg |
Size: | 1CBM: L1300*W880*H1230mm, 5 CBM: L2300*W1650*H1700mm |
Thickness | 1CBM : single layer thickness ≥5 mm, 5 CBM single layer thickness ≥7mm |
Inspection hole | 1 CBM: One inspection hole with inner diameter 230mm 5 CBM: Two inspection hole with inner diameter 230mm |
Corrosion Resistance | Acid resistance (5% sulfuric acid, 72h), no surface change Alkali resistance (5% sodium hydroxide, 72h), no change on the surface |
High temperature resistance | 80℃, 48h, no change on the surface |
Leakage | Fill with water after the drop test, and observe no leakage after 24h |
Freeze Resistance | put it at -40°C for 24h, then it at normal temperature for 24h. After Repeated three times , the tank body is not broken, damaged, and there is no deformation affecting the use. |
Static load | Fill Full water under normal environment wih 400kg weights evenly on the top, in 24h, no cracks, damages, no deformation . The urn body and the urn cover are complete in good sealing performance after assembly and firmly fixed. |
Working Principle


Model | Working Craft | Treating Capacity /Day | Qty of User |
BCSFP-001 | A/O Denitrification Process | 1CBM | 3-10 |
BCSFP-005 | A/O Denitrification Process | 5CBM | 10-20 |
Installation & Project

1) .The equipment foundation should be handed over and inspected before installation. The foundation strength should meet design required. And suggest remeasure the coordinate position and elevation of the foundation. Need clear all the oil, gravel, soil, and stagnant water on the surface of the equipment foundation .
2) .Mark the center line and the equipment position line on the top surface of the foundation, and check again
that the horizontal error and flatness of the top surface of the foundation are ≤ 3mm. If the flatness deviation is large,
Try to spread 5~10cm fine sand for leveling.
3).Befeore lifting the equipment, Please be clear the equipment loading and unloading site, direction and equipment transportation orders. Choose the suitable crane according to the equipment weight as well the loading and unloading site conditions
4).When hoisting the equipment body, tie the lifting belt to the inlet and outlet pipes, Lift itabove the corresponding construction site and adjust the equipment position. Then place the equipment on the installation site slowly with preventing vibration and bumps. Make sure the position and direction of the tank correctly, and the spacing between them must be correct, too.
5).Pipeline installation& connection should be considered when the equipment are ready. Connect the sewage pipe according to the installation drawing. The joints must be tightened and the interfaces can be stablen by glue.
6).After installation, Must injuct the sewage into the equipment (if there is no sewage, other water sources or tap
water can be used instead) between 1/2 and 2/3 of the tankbody. To check whether the equipment and pipelines are leaking. Make sure that no leakage at the pipe joints during the water test, and the equipment
should not be dislocated or tilted due to the rising ground water.
7).Before backfilling the foundation pit, check whether the water filling in the equipment meets the requirements.
Ensure that the equipment is not horizontally misplaced during backfilling and the bottom of the equipment
must be manually compacted with soil. After the equipment is installed, it needs to be backfilled in time.
After backfilling, water should be injected to 10cm below the pipe in/outlet port to prevent the equipment
from floating due to the high groundwater level
Company Profile
Hefei Bright Corner Building Co.,TD, located at the capital of Anhui province ,Hefei City . As the professional Supplier,
Bright Corner specialized in producing and marketing on PP/PE/FRP Sewage Treating Construction material with many years.
And developed Anhui as well as other several production site covering an area of 19400 square meters.
Supply outdoor Household Sewage Treating items as Grease Trap, Septic Tanks, and Integrated Sewage Treatment Plants
designed for efficient wastewater management. Utilizing advanced FRP and PP/PE materials, these products offer high
durability, corrosion resistance, and leak-proof performance. Widely applied in residential, commercial, and rural environments,
they meet strict environmental standards while ensuring low maintenance and long service life.
With the conception of “Integrity Management, Win-Win cooperation', Bright Corner products have gradually
accepted in the market both at domestic and aboard. Have exported to more than 20 countries with good reputation.
We sincerely hope to get chance to cooperate with everyone who interesting in the landscape material and Sewage
Treating Items in the further

Other Sewage Treatment

If More Question, Welcome to contact As Below :
